For the third quarter of 2015 for the state ecological examination 343 documents have arrived. In comparison with the corresponding period of 2014 the quantity of the arrived materials has increased on the lower in 0,9 times.

The analysis of the materials which have arrived for the state ecological examination for the third quarter 2015 in comparison with the corresponding period of 2014 is presented in the form of the following diagramme.

 

 

From 343 materials for the third quarter 2015 for the state ecological examination has arrived:

  • Predesign materials – 4;
  • Civil-engineering designs and reconstruction of objects – 137;
  • Projects MPE – 138;
  • Projects MPD – 7;
  • Projects SPW – 27.

 

 

 

 

 

 